When a cylinder fails, (leaks), but it is encased with P.V.C. casing odds are the P.V.C. casing had been compromised some way, & should be replaced, with new P.V.C., & installed correctly so it will provide the means of protection,…
Typically we do not remove old elevator cylinders. However if the Elevator crew can’t get it & ask us to assist them we can remove almost anything, including stuck cylinders, usually in a timely fashion. This 65’cylinder required the works. 50 ton jacks,…
After cleaning out an 18″ steel casing at an undisclosed Museum, the casing either was 5′ short of the length needed. So our crew fabricated, on site, a drop in, with stabilizers, to install. This kept us on schedule…
We have a 2nd yard stocked with lots of casings, steel, P.V.C., & many other items. Most of our fabrication is done by us, there, to save time, keep on schedule, & get our part of the project done right,…
Advancing steel casing over old wooden piling, cleaning out, 65′ hole, that was originally drilled off center 10″ each way causing on going maintenance problems, bad ride quality, & undue rail stress. Sometimes you need to fix it right.