Advancing steel casing over old wooden piling
Advancing steel casing over old wooden piling, cleaning out, 65′ hole, that was originally drilled off center 10″ each way causing on going maintenance problems, bad ride quality, & undue rail stress.
Advancing steel casing over old wooden piling, cleaning out, 65′ hole, that was originally drilled off center 10″ each way causing on going maintenance problems, bad ride quality, & undue rail stress.