We are very capable for both solar foundations and wind foundations. Drilling only or drill and install all material. We have both track and rubber tire equipment for rough sites or sites on finished asphalt or concrete.

Telecommunications Tower Installation

After being awarded an undisclosed telecommunications tower project , needing 48″ diameter caissons , at a number of locations . We designed this 4′ diameter dirt/rock auger , had it fabricated , per our spec. It works fabulous . You are  only as good as your tools & equipment .

Contact KM McRae Inc. at
(510)-500-5481

“Specialized Drilling Operation”
Foundation Piers & Caissons for: